Clear
55 ° F
Full Weather
Sponsored By:

Roadwork For The First Week In October

Sponsored by:

Motorists can expect a few delays on Mother Lode highways this week, from October 2nd to October 8th.

Work continues around the clock on the roundabout at Chicken Ranch/Sierra Rock Road on Highway 108. K-rail will be installed beginning Sunday and continuing through Friday from 9 pm to 6 am. During the day both sides of road will be restricted for pavement work.

On Highway 108 work continues with one of the lanes closed from East Long Barn Road to Helipo Rood and from there to Cascade Creek Road (mile marker 19 to 40.4) for highway construction. The work begins Monday and continues through Thursday from 6:00 pm until 5:00 pm and will wrap up on Friday at 3 pm.

On Highway 4 from Bonanza Mine Way to Appaloosa Road, the Wagon Trail Realignment Project as detailed here, will impact traffic. Expect traffic breaks Monday through Thursday from 7 am to 5 pm and on Friday from 7 am to 3 pm.

On Highway 12 in Calaveras from Lime Creek Road, two miles to Double Springs Road the right and left shoulder of the road will be restricted for utility work. The work is scheduled Monday through Thursday from 8 am to 5 pm.

On Highway 49 in Calaveras from the rest area at Carson Hill to Gun Club Road in Calaveras drainage work will limit surface street traffic to one-way. The work begins Monday and continues through Friday from 6 am to 6 pm.

On Highway 49 in Tuolumne and Mariposa from Moccasin Creek to Bear Valley Road (mile marker 6.4 to 29.4) shoulder work will limit traffic to one-way. The work is scheduled Monday through Wednesday from 7 am to 3:30 pm.

On Highway 132 at the Stanislaus/Tuolumne County Line, six miles to Pepito Drive shoulder work will limit traffic to one-way on Thursday and Friday from 7 am to 3:30 pm.

Road projects are subject to change due to traffic incidents, weather, availability of equipment, and/or materials and construction-related issues. Caltrans asks motorists to obey signage and flaggers while slowing down around crews and equipment in the cone zones.

Feedback