Mostly Clear
66.6 ° F
Full Weather
Sponsored By:

Caltrans Road Work Across The Mother Lode

Sponsored by:

Stockton, CA — Caltrans crews will be busily toiling along the Mother Lode highways next week.

Along Highway 4, between Copperopolis and Angels Camp, shoulder work is scheduled each weekday between one-and-a-half miles east of O’Byrnes Ferry Road and Angels Oaks Drive from 8:45 a.m. until 3:15 p.m., with one-way traffic control and possible motorist delays of five minutes.

Also on Highway 4, crack seal work between Beatrice Drive and Poison Springs Road will be ongoing Tuesday through Friday from 8:30 a.m. until 3 p.m., with one-way traffic control and five-minute delays.

On Monday, along Highway 26, between Jenny Lind Road and Heinemann Lane, Caltrans will be doing drainage work from 9:30 a.m. until 3 p.m., with one-way traffic controls in place and potential ten-minute delays.

Tuesday, along Highway 49, utility crews will be working between south of Gold Strike Road and Spring Hills Road, from 7 a.m. until 5 p.m. with one-way traffic control and possible five-minute delays.

Each weekday along Highway 49 maintenance operations are scheduled along the shoulders between the Mariposa-Tuolumne County line and South State Highway 120 from 8 a.m. until 4 p.m. with potential five-minute delays. Crack seal work is also slated all week between Columbia Way and Von Kleiben Road from 8:30 a.m. until 3:30 p.m. with one-way traffic controls and possible five-minute delays.

Feedback