X
Visit Full Site

Mother Lode Road Work

In Tuolumne County, crews will be doing crack seal operations on Highway 108. Flaggers will be conducting one-way traffic control beginning at the 7,000-elevation marker to the 9,000 marker on the highway.

The work will begin Monday, September 8 and run through Friday, September 12 from 7 a.m. until 2:45 p.m. each day. Motorists can expect 5-minute delays.

In Calaveras County, there will be one-way traffic control for paving on Highway 4 from Main Street/Douglas Flat to Meko Drive from 6:00 a.m. until 4:00 p.m. Monday, September 8 through Friday, September 12.

You can expect 20-minute delays. Caltrans asks motorists to take an alternate route whenever possible.

This post was last modified on 09/06/2014 3:28 pm

Written by Tracey Petersen.

Sign up for our Breaking News Alerts and the myMotherLode.com Daily Newsletters by clicking here. Report breaking news, traffic or weather to our News Hotline (209) 532-6397. Send Mother Lode News Story photos to news@clarkebroadcasting.com.

For Caltrans traffic information for Highway’s 4, 49, 59, 108, and 120 plus a view of traffic on other Mother Lode roads and gas prices click on “Traffic” or keyword: traffic For an overview of extreme weather news stories go here.

Tags: Traffic