X
Visit Full Site

Pipeline Replacement To Wrap Up With Water Shutdowns All Month

San Andreas, CA – Some Calaveras County Water District (CCWD) customers will have a disruption in their water service throughout the month as the main water transmission pipeline replacement project wraps up.

Those impacted will be along the Highway 4 corridor, specifically between Murphys and Avery, as a transition to the new pipeline will occur gradually over the next couple of weeks. The district advises that will unfortunately produce a series of unavoidable water shutoffs. Below is the district schedule during the month of October:

Ebbetts Pass Reach 1 Project Schedule for October

The utility relays that each shut down will start no earlier than 8 a.m. and last less than eight hours.  CCWD details that water quality will be tested and verified prior to bringing it into service, so a boil water advisory is not anticipated once service is restored. District officials add that the new pipeline has been thoroughly disinfected and flushed.

Customers will receive a pre-recorded phone calls and text messages providing date-specific water shutoff notices, but no new door tags will be delivered. Questions can be directed to CCWD customer service at (209) 754-3543.

Written by Tracey Petersen.

Sign up for our Breaking News Alerts and the myMotherLode.com Daily Newsletters by clicking here. Report breaking news, traffic or weather to our News Hotline (209) 532-6397. Send Mother Lode News Story photos to news@clarkebroadcasting.com.

For local news delivered to your email daily, sign up myMotherLode’s FREE Daily Newsletter here.

Tags: Local News