Drizzle
54 ° F
Full Weather
Sponsored By:

CalTrans Road Work For The Coming Week

Sponsored by:

Stockton, CA — Weather permitting CalTrans will be setting up work zones on four Mother Lode highways next week.

Along Highway 4 in Calaveras County, shoulder work will continue in Murphys between Allen Lane and Mitchler Avenue each weekday from 7 a.m. until 5 p.m. During the same days and times, utility crews will be working between Manuel Road and the Arnold Byway, with one-way traffic control in place and potential motorist delays of about five minutes.

On Highway 26, tree work crews will work Monday through Wednesday between Wood House Mine and Stanley roads from 8 a.m. until 3 p.m. with intermittent one-way traffic control, and possible five-minute delays.

On Highway 49 in Calaveras County, shoulder work will continue each weekday between Angels and Pool Station roads from 7 a.m. until 5 p.m.

Along Highway 49 in Tuolumne County, crack seal work is scheduled between Jackass Hill and Rawhide roads each weekday from 8:30 a.m. unil 2:30 p.m. with potential five-minute motorist delays.

Feedback